@machine424 machine424 commented Sep 8, 2025

running the checks concurrently so we can retry more without slowing down the test. Actually that makes the test run faster.

some other adjustments.

@machine424
Copy link
Contributor Author

/payload-aggregate periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-serial-virtualmedia-2of2 10

@machine424
Copy link
Contributor Author

/payload-aggregate periodic-ci-openshift-release-master-nightly-4.21-e2e-vsphere-ovn-serial 10

Copy link
Contributor

openshift-ci bot commented Sep 8, 2025

@machine424: trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-serial-virtualmedia-2of2

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/953b07b0-8cad-11f0-88c6-57aa50f3f71f-0

Copy link
Contributor

openshift-ci bot commented Sep 8, 2025

@machine424: trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-vsphere-ovn-serial

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/9b714d10-8cad-11f0-8747-eefb0f4c0f39-0

Copy link
Contributor

openshift-ci bot commented Sep 8, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: machine424

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Sep 8, 2025
Copy link
Contributor

openshift-ci bot commented Sep 8, 2025

@machine424: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-metal-ipi-serial-ovn-ipv6-1of2 d439c18 link false /test e2e-metal-ipi-serial-ovn-ipv6-1of2
ci/prow/e2e-openstack-ovn d439c18 link false /test e2e-openstack-ovn
ci/prow/e2e-aws-disruptive d439c18 link false /test e2e-aws-disruptive
ci/prow/e2e-metal-ipi-ovn-dualstack-local-gateway d439c18 link false /test e2e-metal-ipi-ovn-dualstack-local-gateway
ci/prow/e2e-metal-ipi-serial-2of2 d439c18 link false /test e2e-metal-ipi-serial-2of2
ci/prow/e2e-metal-ipi-serial-1of2 d439c18 link false /test e2e-metal-ipi-serial-1of2
ci/prow/e2e-azure d439c18 link false /test e2e-azure
ci/prow/e2e-metal-ipi-serial-ovn-ipv6-2of2 d439c18 link false /test e2e-metal-ipi-serial-ovn-ipv6-2of2
ci/prow/e2e-metal-ipi-ovn-dualstack d439c18 link false /test e2e-metal-ipi-ovn-dualstack
ci/prow/e2e-metal-ipi-ovn-ipv6 d439c18 link true /test e2e-metal-ipi-ovn-ipv6
ci/prow/e2e-gcp-ovn-techpreview d439c18 link false /test e2e-gcp-ovn-techpreview
ci/prow/e2e-aws-ovn-single-node d439c18 link false /test e2e-aws-ovn-single-node
ci/prow/e2e-metal-ipi-ovn-kube-apiserver-rollout d439c18 link false /test e2e-metal-ipi-ovn-kube-apiserver-rollout
ci/prow/e2e-metal-ipi-ovn d439c18 link false /test e2e-metal-ipi-ovn
ci/prow/e2e-metal-ipi-virtualmedia d439c18 link false /test e2e-metal-ipi-virtualmedia
ci/prow/e2e-aws-ovn-serial-2of2 d439c18 link true /test e2e-aws-ovn-serial-2of2
ci/prow/e2e-aws-ovn-single-node-serial d439c18 link false /test e2e-aws-ovn-single-node-serial

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@machine424
Copy link
Contributor Author

/payload-aggregate periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-serial-virtualmedia-2of2 10

Copy link
Contributor

openshift-ci bot commented Sep 9, 2025

@machine424: trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-serial-virtualmedia-2of2

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/4de45550-8d5d-11f0-9bb1-1bbc9de7587f-0

@machine424
Copy link
Contributor Author

/payload-abort

Copy link
Contributor

openshift-ci bot commented Sep 9, 2025

@machine424: aborted active payload jobs for pull request #30219

@machine424
Copy link
Contributor Author

/payload-aggregate periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-serial-virtualmedia-2of2 10

@machine424
Copy link
Contributor Author

/payload-aggregate periodic-ci-openshift-release-master-nightly-4.21-e2e-vsphere-ovn-serial 10

Copy link
Contributor

openshift-ci bot commented Sep 9, 2025

@machine424: trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ipi-ovn-serial-virtualmedia-2of2

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/8a38d260-8d5d-11f0-8f8e-31b77d3da48e-0

Copy link
Contributor

openshift-ci bot commented Sep 9, 2025

@machine424: trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-vsphere-ovn-serial

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/8e61bb90-8d5d-11f0-869d-bc65d221d6d0-0

@machine424 machine424 changed the title chore(extended/prometheus): make test more lenient WIP: chore(extended/prometheus): make test more lenient Sep 9, 2025
@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Sep 9, 2025
Copy link

openshift-trt bot commented Sep 9, 2025

Job Failure Risk Analysis for sha: e4f1166

Job Name Failure Risk
pull-ci-openshift-origin-main-e2e-aws-disruptive IncompleteTests
Tests for this run (106) are below the historical average (438): IncompleteTests (not enough tests ran to make a reasonable risk analysis; this could be due to infra, installation, or upgrade problems)

Risk analysis has seen new tests most likely introduced by this PR.
Please ensure that new tests meet guidelines for naming and stability.

New Test Risks for sha: e4f1166

Job Name New Test Risk
pull-ci-openshift-origin-main-okd-scos-e2e-aws-ovn Medium - "Find the input image origin_scos-4.21_tools and tag it into the pipeline" is a new test, and was only seen in one job.

New tests seen in this PR at sha: e4f1166

  • "Find the input image origin_scos-4.21_tools and tag it into the pipeline" [Total: 1, Pass: 1, Fail: 0, Flake: 0]

@machine424
Copy link
Contributor Author

/retitle OCPBUGS-61193: chore(extended/prometheus): make 'targets auth' test more lenient and more resilient.

@openshift-ci openshift-ci bot changed the title WIP: chore(extended/prometheus): make test more lenient OCPBUGS-61193: chore(extended/prometheus): make 'targets auth' test more lenient and more resilient. Sep 9, 2025
@openshift-ci-robot openshift-ci-robot added jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. labels Sep 9, 2025
@openshift-ci-robot
Copy link

@machine424: This pull request references Jira Issue OCPBUGS-61193, which is invalid:

  • expected the bug to target the "4.21.0" version, but no target version was set

Comment /jira refresh to re-evaluate validity if changes to the Jira bug are made, or edit the title of this pull request to link to a different bug.

The bug has been updated to refer to the pull request using the external bug tracker.

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot openshift-ci-robot added the jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. label Sep 9, 2025
@openshift-ci openshift-ci bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Sep 9, 2025
@machine424
Copy link
Contributor Author

/jira refresh

@openshift-ci-robot openshift-ci-robot added jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. and removed jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. labels Sep 9, 2025
@openshift-ci-robot
Copy link

@machine424: This pull request references Jira Issue OCPBUGS-61193, which is valid. The bug has been moved to the POST state.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state ASSIGNED, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @Tai-RedHat

In response to this:

/jira refresh

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot requested a review from Tai-RedHat September 9, 2025 15:36
@machine424
Copy link
Contributor Author

/verified by @machine424

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Sep 9, 2025
@openshift-ci-robot
Copy link

@machine424: This PR has been marked as verified by @machine424.

In response to this:

/verified by @machine424

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link

@machine424: This pull request references Jira Issue OCPBUGS-61193, which is valid.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state POST, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @Tai-RedHat

In response to this:

running the checks concurrently so we can retry more without slowing down the test. Actually that makes the test run faster.

some other adjustments.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. verified Signifies that the PR passed pre-merge verification criteria
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants